Return to release.frag CVS log | Up to [LON-CAPA] / doc / build |
- adding FC5 to the testing release section - updating the release scedule - updating the release scedule - updating the release scedule - updating the release scedule
<hr /> <a name="schedule" /> <h3>2.2 Release Schedule</h3> <ul> <li>July 5th - a 2.1.99.0 was be installed on MSU</li> <li>July 16th - a 2.1.99.1 will installed on MSU</li> <li>August 11th - 2.2.0 release</li> </ul>